Other Projects
North Link Stage 3
Installation of 4000m of 400mm HV cable and associated overhead pole replacement works. View
National Broadband Network (NBN)
Installation of communications conduits via directional drilling View
Layman Road Streetlights
Installation of 40+ streetlights in an environmentally sensitive location adjacent to wetlands. View
Service Locations
Locating, proving and documenting location of existing underground assets to provide client’s with certainty regarding proposed underground works. View
Deep Earth Drilling
Installation of earth electrodes via deep earth drilling and jackhammer to achieve desired results, including testing and connections. Works conducted in all ground conditions including granite. View
HV/LV Cable Installations
All relevant scopes of works associated with the installation of electrical apparatus for the supply authority. View
Telstra Blackspot Project
Installation of power infrastructure to allow Telstra to service various “black spots” in remote and regional areas of Western Australia. All remote works conducted for this project included switching, line work, underground work and terminations and energisation. View
Busselton Feeder Upgrade
Installation of 10,000m of 400mm HV cable and associated overhead pole replacement works View
Yarloop Emergency Fire Works
GUS was called upon in the sad event of the Yarloop Fires to help with the reinstatement of the electricity network. What a sad sight. View
Transformer Installation – Rendezvous Road
The boys handy work installing transformers at Rendezvous Road. Compliments from Western Power for another job well done. View
Margaret River Pro – First Generator Free Classic Held
The completion of this job by Geographe Underground Services facilitates the very first generator free “Margaret River Pro” Surf Classic which was held 16-24 March 2013 View
Mowen Road – High Voltage Power Supply Upgrade
Mowen Road – High Voltage Power Supply Upgrade works have are now completed. 7km of cable was installed by horizontal drilling, chain trenching and trenching. View
Express Feeders 2 & 3 at Broome
Horizon Power – Express Feeders 2 & 3 Broome – approximately 4.5km – 33kv View
Power Supply and Capacity Upgrade
Horizon Power – Power Supply and Capacity Upgrade – Works to Hotel Rottnest and Dome Café (Stage 2) View
Installation of HV Cables and Equipment at Broadwater
Western Power – Part B & C Broadwater – Fault Rating Upgrade – Installation of HV Cables and Equipment View
North West Power Lines at Kununurra
North West Power Lines at Kununurra – Upgrade Installation TX View
Undergrounding power network at Roebourne
Undergrounding power network at Roebourne Stage 2 & 3. View
Feeder Cables at Vasse, Yallingup and Treeton
Western Power – Vasse, Yallingup and Treeton – Feeder Cables – 12kms – 400HV View
Mungullah (Carnarvon) Power Station
Horizon Power – Mungullah (Carnarvon) Power Station – Cable Installation, Jointing and Testing – 11000m optic fibre, 33000m – 1000mm2 cable View
Margaret River Bushfires Emergency Work
Western Power – EMERGENCY WORK – Margaret River Bushfires. View